Phase I & II Environmental Site Assessments
Environmental Impact Assessments
Environmental Risk Assessments
Regulatory Compliance Audits

Licensed Tank Removal Contractor
Spill Prevention, Control and Countermeasure (SPCC) Plans
LUST Program Reporting
Site Investigation (Classification)
Remedial Action Design & Implementation
LUST Fund Reimbursement Applications

Abandoned Mine Reclamation Planning and Implementation
Environmental Remediation Design & Implementation
In-situ Bioremediation and Chemical Oxidation
Low-temperature Thermal Desorption
Soil Vapor Extraction
Passive Bio-venting
In-situ & Ex-situ Chemical Stabilization
Waterfront Restoration and Redevelopment

Grant Application and Award
Site Identification and Selection
Comprehensive Environmental Evaluation (SRP)
Remedial Planning and Design

RCRA Compliance Monitoring
RCRA Permitting
Closure Planning & Implementation
Remedial Action Design & Evaluation
Waste Minimization Design & Evaluation
Solid Waste Landfill Design

Compact, Rugged and Powerful Skid Steer Drilling

Direct Push Soil Sampling
Hollow Stem Augering
Monitoring Well Installation

Soil, Sediment and Groundwater Sample Collection
OSHA 40-Hour HAZWOPER Trained Personnel

Single-Family Residential Subdivision Design
Multi-Family Residential Development
Industrial / Commercial Site Development
Infrastructure Design, Evaluation and Improvement

Water Main Extensions
Sanitary Sewer Extensions
State Highway Entrance Permits
Roadway Design & Evaluation
Stormwater Management Design

Large-scale Parking Lot Design & Evaluation

Water Supply and Well-Field Design & Evaluation
Water Distribution System Design & Evaluation
Sanitary Sewer System Design & Evaluation
Wastewater Pump Station Design & Evaluation
Water and Wastewater Treatment Planning & Evaluation

Stormwater Detention Pond Design & Evaluation
Storm Sewer Design & Evaluation
Industrial, Commercial and Construction NPDES Permitting
Stormwater Pollution Prevention Plans (SWPPP)
Runoff Control Planning & Evaluation
Flood Control Design & Evaluation

Watershed Management Evaluation & Planning
Surface Water Quality Modeling and Control
Total Maximum Daily Load (TMDL) Evaluation
Load Allocation & Waste Load Allocation Development
Clean Water Act Compliance Monitoring

Boundary Survey Plat Preparation
Construction Plan Preparation
Contour Mapping
Subdivision Plat Preparation
Right-of-Way Plat Preparation
Utility Easement Plat Preparation

Civil Construction

Excavation (mechanical & vacuum)
Grading
Drainage
Erosion Control
Demolition
Land Clearing
Hauling